- 0
- 0
- Days
- 0
- 0
- :
- 0
- 0
- :
- 0
- 0
Package Qty | Priced per Package |
---|---|
1-4 | US $7.49 |
5+ | US $1.58 |
Pay with your Visa credit card Learn more
Pay with your Mastercard
Pay by Paypal Learn more
Bank Transfer Learn more
I Want Mixed Products
480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green, 6~23x4~9mm, Hole: 2~3mm, 120pcs/style(WOOD-PH0002-47)
Comments: Please input your mixed request.
Item Code: Please input the item code.
Comments: Please input your mixed request.
Size | 6~23x4~9mm, Hole: 2~3mm, 120pcs/style |
Material | Wood |
Color | Green |
Shape | Oval |
Usage | Beads |
Package Size | 1 Box per package |
480Pcs 4 Style Dyed Natural Wood Beads, Oval/Oblong, Lead Free, Green
Size:
Round: about 6x4~5mm, Hole: 2mm, about 120pcs;
Round: about 8x7mm, Hole: 3mm, about 120pcs;
Round: about 10x9mm, Hole: 3mm, about 120pcs;
Oval/Oblong: about 23x8~9mm, Hole: 2.5mm, about 120pcs;
Box: 22x16x1.5cm, 1pc.
Priced per 1 Box
Please Note: The color may be slightly different from the picture because of different display device.
Search by Image
·Search kbeads with an image instead of text. Try dragging an image here.
Uploading File